Customer Details
Survey date: 2026-10-29Site Survey Photos
0 added1Site Access
0/5 photosDriveway/Entrance
Gate/Security
Front of house
Left and right sides of the house
Rear of house (clear view of roof surfaces for possible panel placement)
2Measurements
0/6 photosLength Measurement
Width Measurement
Height/Pitch
Photos showing shading from trees, chimneys, or nearby building
Attic access (if applicable) and attic structural photos (trusses, rafters, joists)
Attic insulation and space clearance photos
3360 View
0/8 photos0° Azimuth (North)
45° Azimuth (Northeast)
90° Azimuth (East)
135° Azimuth (Southeast)
180° Azimuth (South)
225° Azimuth (Southwest)
270° Azimuth (West)
315° Azimuth (Northwest)
4Electrical Info
0/8 photosMain Service Panel (MSP) — wide shot with surroundings
Main breaker label (rating in amps)
Manufacturer label (model number, voltage, bus rating)
Existing solar breakers (if any)
Sub-panels (outside & inside, with labels)
Conduit runs, spare breaker space, and wire routing areas
Grounding electrode conductor connection
Sub-panels (wiring) deadfront off
5Metering
0/3 photosUtility meter — clear shot of face and numbers
Any additional meters (sub-meters, production meters, net meters)
Label plates for utility & disconnects
6Site Measurements & Structural
0/5 photosDistance from MSP to potential inverter location
Clear photo of possible inverter mounting wall (include surroundings)
Clearances around proposed equipment locations (NEC requirements)
Rafter spacing & size (tape measure visible in shot)
Any structural concerns (rot, termite damage, cracks, sagging)
7Ground or Wall Mount (if applicable)
0/3 photosProposed array area with wide shot
Soil condition photos (if ground mount)
Mounting wall close-ups (material, condition)
8Existing Solar (if any)
0/12 photosWide shot of roof plane(s) showing panels
Close-up of modules (front and back if possible, to capture model numbers, placcard).
Inverter(s) close up showing inverter placcard, brand, model, S/N, specs
Racking/attachments detail shot (if accessible)
Combiner box (outside and inside if safe to open)
Individual battery close-ups (showing brand/model/serial).
wide shot battery bank location
Existing system BOS showing all componets location
Clear shot of labels, disconnects, breakers
Point of Interconnection (POI) - showing PV and Batt breakers, diconnects, CTs
conduits/wiring runs - tied to existing systems
Grounding/bonding connections
9Aditional building on property
0/3 photosattached buildings (if any)
dettached building (if existing)
patio photos